Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

The Nuclear Regulatory Commission says The Reactor Revival Is NOT Ready For Prime Time

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » Environment/Energy Donate to DU
 
DogPoundPup Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Jul-27-08 01:02 AM
Original message
The Nuclear Regulatory Commission says The Reactor Revival Is NOT Ready For Prime Time
A devastating blow to the much-hyped revival of atomic power has been delivered by an unlikely source—the Nuclear Regulatory Commission. The NRC says the “standardized” designs on which the entire premise of returning nuclear power to center stage is based have massive holes in them, and may not be ready for approval for years to come.

Delivered by one of America’s most notoriously docile agencies, the NRC’s warning essentially says: that all cost estimates for new nuclear reactors—and all licensing and construction schedules—are completely up for grabs, and have no reliable basis in fact. Thus any comparisons between future atomic reactors and renewable technologies are moot at best. And any “hard number” basis for independent financing for future nukes may not be available for years to come, if ever.

These key points have been raised in searing testimony before state regulators by Jim Warren of the North Carolina Waste and Awareness Reduction Network and Tom Clements of the South Carolina Friends of the Earth, and by others now challenging proposed state-based financing for new Westinghouse AP-1000 reactors. The NRC gave conditional “certification” to this “standardized” design in 2004, allowing design work to continue. But as recently as June 27, the NRC has issued written warnings that hundreds of key design components remain without official approval. Indeed, Westinghouse has been forced to actually withdraw numerous key designs, throwing the entire permitting process into chaos.

The catastrophic outcome of similar problems has already become tangible. After two years under construction, the first “new generation” French reactor being built in Finland is already more than two years behind schedule, and more than $2.5 billion over budget. The scenario is reminiscent of the economic disaster that hit scores of “first generation” reactors, which came in massively over budget and, in many cases, decades behind promised completion dates.

In North and South Carolina, public interest groups are demanding the revocation of some $230 million in pre-construction costs already approved by state regulators for two proposed Duke Energy reactors. In both those states, as well as in Florida, Alabama and Georgia, Westinghouse AP-1000 reactors have been presented to regulatory commissions to be financed by ratepayers as they are being built.

This astounding pro-utility scheme forces electric consumers to pay billions of dollars for nuclear plants that may never operate, and whose costs are indeterminate. Sometimes called Construction Work in Progress, it lets utilities raise rates to pay for site clearing, project planning, and down payments on large equipment and heavy reactor components, such as pressure vessels, pumps and generators, that can involve hundreds of millions of dollars, even before the projects get final federal approval. The process in essence gives utilities an incentive to drive up construction costs as much as they can. It allows them to force ratepayers to cover legal fees incurred by the utilities to defend themselves against lawsuits by those very ratepayers. And the public is stuck with the bill for whatever is spent, even if the reactor never opens—or if it melts down before it recoups its construction costs, as did Pennsylvania’s Three Mile Island Unit Two in 1979, which self-destructed after just three months of operation.

Continue reading @ http://www.commondreams.org/archive/2008/07/26/10619/
Printer Friendly | Permalink |  | Top
MrModerate Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Jul-27-08 01:34 AM
Response to Original message
1. The key phrase here is "notoriously docile agencies . . ."
While I think that perhaps overstates the case, it is true that the NRC always tries to put itself in a partnership position with utilities rather than an adversarial one when it comes to building, maintaining, or decommissioning nukes. At the same time, they know the science and the engineering and are widely regarded as honest.

That having been said, I think it's unrealistic to think that the utilities won't find a way to work with (or around) the NRC to get a new generation of nuke stations under way and on stream. There's simply too much impetus behind replacing fossil fuels with . . . something . . . to hold back the tide. As much as I respect Al Gore, I don't think we're going to see renewables in a dominant position in 10 years (maybe if HE was president . . .)
Printer Friendly | Permalink |  | Top
 
madokie Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Jul-27-08 06:32 AM
Response to Original message
2. Lets quit wasting time and money on this
WE need answers today and all I'm seeing is more questions even though the questions of years past are never answered. Wind and Solar can help us today while Nuclear energy won't. At best its still years out. What to do with the waste is as relevent today as it was in '72 - '73 when some of us were asking then.
Its all a big sham, always was.
Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Jul-27-08 01:00 PM
Response to Original message
3. I agree with #1, the NRC saying this is nothing short of a knife to the heart
I agree with #1, the NRC saying this is nothing short of a knife to the heart of this Republican grab to maintain control over the most basic commodity in people's lives.

Printer Friendly | Permalink |  | Top
 
phantom power Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Jul-27-08 01:18 PM
Response to Original message
4. Paging the department of circular reasoning department...
Shorter version:

Warren and Clements put words in the mouth of the NRC, based on spinning some unapproved design documents. W+C claim the NRC says nukes "aren't ready for prime time," which in fact the NRC hasn't said.

Then, Wasserman writes an article saying "look! Searing testimony before state regulators proves nukes aren't ready for prime-time!"

Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Jul-27-08 02:02 PM
Response to Reply #4
5. And the reason financial institutions are saying the same thing about costs is???
Printer Friendly | Permalink |  | Top
 
Indenturedebtor Donating Member (1000+ posts) Send PM | Profile | Ignore Thu Jul-31-08 11:15 AM
Response to Reply #4
6. I hear a new plant is going up on Da Nile. Maybe we should ask the Egyptians
what they think about this? :shrug:
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Sat May 11th 2024, 09:55 AM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Topic Forums » Environment/Energy Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC