Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

* Co. started detention camp projects @ Gitmo before 9-11

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » September 11 Donate to DU
 
libertypirate Donating Member (1000+ posts) Send PM | Profile | Ignore Wed Jun-15-05 05:13 PM
Original message
* Co. started detention camp projects @ Gitmo before 9-11
Edited on Wed Jun-15-05 05:16 PM by libertypirate


No. 386-02
5 p.m. ET July 26, 2002
http://www.defense.gov/contracts/2002/c07262002_ct386-02.html

Brown & Root Services, a division of Kellogg Brown & Root, Arlington, Va., was awarded today a $16,000,000 task order under a previously awarded cost reimbursement, indefinite-delivery and indefinite-quantity construction contract for construction of a 408-unit detention camp at the Radio Range area of U.S. Naval Station, Guantanamo Bay, Cuba. Units will be of modular steel construction. Each unit measures 6 feet 8 inches by 8 feet and includes a bed, a toilet, and a hand basin with running water. Work will be performed in Guantanamo Bay and is to be completed by April 2002. Contract funds will not expire at the end of the current fiscal year. The basic contract was competitively procured with 44 proposals solicited, three offers were received, and award was made on June 29, 2000. The total contract amount is not to exceed $300,000,000, which includes the base period and four option years. The Naval Facilities Engineering Command, Atlantic Division, Norfolk, Va., is the contracting activity (N62470-00-D-0005).


and....
No. 386-02
5 p.m. ET July 26, 2002
http://www.dod.mil/contracts/2002/c07262002_ct386-02.html

Brown & Root Services, A Division of Kellogg Brown & Root, Arlington, Va., is being awarded $9,700,000 for Task Order 0019 under a cost-reimbursement, indefinite-delivery and indefinite-quantity construction contract for construction of a 204 unit Detention Camp, Phase III, located on the windward side of the Naval Station, at the Radio Range area of U.S. Naval Station, Guantanamo Bay, Cuba. Units will be of modular steel construction. Each unit measures approximately 6 feet 8 inches by 8 feet and includes a bed, a toilet, and a hand basin with running water. Work will be performed in Guantanamo Bay and is to be completed by October 2002. Contract funds will not expire at the end of the current fiscal year. The basic contract was competitively procured with 44 proposals solicited, three offers received and award made on June 29, 2000. The total contract amount is not to exceed $300,000,000, which includes the base period and four option years. The Naval Facilities Engineering Command, Atlantic Division, Norfolk, Va., is the contracting activity (N62470-00-D-0005).

There are more documents of other contracts awarded for other services. This was on Randi Rhodes yesterday.
Printer Friendly | Permalink |  | Top
hack89 Donating Member (1000+ posts) Send PM | Profile | Ignore Wed Jun-15-05 09:07 PM
Response to Original message
1. You mean Clinton Co started the camps.
If it was awarded in June 2000, the process started in early 2000.
Printer Friendly | Permalink |  | Top
 
libertypirate Donating Member (1000+ posts) Send PM | Profile | Ignore Wed Jun-15-05 11:35 PM
Response to Reply #1
2. I don't know that.... That is putting the cart before the horse...
Edited on Wed Jun-15-05 11:36 PM by libertypirate
I know * Co. has been planning this since before his selection and I know military leadership really likes rethuglicans. I do not know if Clinton had anything to do with them. I do know that they were not posted until way after he was no longer the president.

The documents are very strange...
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Fri Apr 26th 2024, 01:26 PM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Topic Forums » September 11 Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC