erpowers Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 03:13 PM
Original message
Drilling a Relief Well
Should the government have forced BP to start drilling a relief well when the oil spill first occured? It seems it might have been better for the government to force BP to drill a relief well earlier in that if the other options failed (which most have) the process of drilling the relief well would have already started.
Printer Friendly | Permalink |  | Top
Ruby the Liberal Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 03:16 PM
Response to Original message
1. It is my understanding that it is a requirement in Canadian waters
for exploratory drills to have relief wells simultaneously drilled.
Printer Friendly | Permalink |  | Top
 
SidDithers Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 03:17 PM
Response to Original message
2. The relief well was started on May 2...nt
Sid
Printer Friendly | Permalink |  | Top
 
OneTenthofOnePercent Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 03:42 PM
Response to Original message
3. When the spill FIRST happened...
They were busy trying to extinguish a fire and rescue people.
The rig burned for two days before it sank.
It took them another day or so to get an ROV down there to even see if the well was leaking oil.

So it was three/four days before they even knew if there was a major leak, if any.

The obvious response at that point is to shut off the wellhead with the BOP.
Wiki says this action takes 24-36 hrs to attempt with ROVs at such a depth
BP engieers estimated it would take up to 6 attempts to close manually close the BOP.

So that's another eight/nine days before they figured out, "ok, we've got a serious problem".
total: ~11/12 days since the blow out??

I believe they began the first relief well drilling about 12-13 days after the initial blow out (May 2nd).
This involves mobilizing an entire drilling rig to the area and preparation.
They must have began mobilizing or planning relief drilling while they were still trying to cap the well.
IMO, that is fairly quick response to set up a drilling rig and start more drilling.

FYI, the first relief well drilling began 5 days before the "dome" was attempted, 9 days before the "top hat", and 12 days before the "insertion tube". The drilling was taking place BEFORE most plans failed.
Printer Friendly | Permalink |  | Top
 
erpowers Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 03:47 PM
Response to Reply #3
4. Did Not Know That
I did not know the relief well drilling had already started. My understanding from watching the news was that they would start the relief well drilling after all other options had failed.
Printer Friendly | Permalink |  | Top
 
Statistical Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 03:56 PM
Response to Reply #4
6. The relief well is the "ultimate backup"
what the media means is that if everything else fails they will fall back on the relief well.

Drilling started almost immediately.

Remember another rig to be put in place, sea floor complex built, and a mile of riser pipe lowered before they could drill the first inch.

Bad news is even starting immediately the first well won't be complete for 70 more days. :(

Relief well is reliable. It was used to stop the 3 largest platforms spills prior to this one, bad news is you simply can't drill a 5 mile shaft "fast".
Printer Friendly | Permalink |  | Top
 
Statistical Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 03:54 PM
Response to Original message
5. The process of drilling relief well did start right away
The drilling began 10 days after spill started.

It took about 10 days to get a rig into posistion and riser pipe lowered, and seafloor complex built.

Bad news is a relief well operation running 24/7 takes a long time. They need to drill 5 miles in this instance and that is going to take 100+ days (about 70 more).
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Fri Apr 26th 2024, 02:12 PM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC