TransCanada Has Already Had To Fix 125 Dents And Sags In Southern Keystone Pipeline
http://thinkprogress.org/climate/2013/11/12/2926341/transcanada-keystone-fixes-report/Synthetic crude oil hasnt yet entered the southern segment of the Keystone XL pipeline, but a report released Tuesday by non-profit consumer rights group Public Citizen says the pipes are already bending, sagging and peeling to the point of a possible spill or leakage of toxic tar sands.
Drawing on the accounts of landowners, citizens and former workers of TransCanada, the report documents alleged construction problems and engineering code violations along the Texas portion of the pipeline, proved by what the group says is a staggering amount of excavations to correct dents and patch holes. Public Citizen is calling on the Pipeline and Hazardous Material Safety Administration to review TransCanadas construction quality assurance records for possible federal violations, and perform a complete re-testing of the pipeline to see if the repairs work.
The government should investigate, and shouldnt let crude flow until that is done, Public Citizens Texas office director Tom Smith said in a statement. Given the stakes the potential for a catastrophic spill of hazardous crude along a pipeline that traverses hundreds of streams and rivers and comes within a few miles of some towns and cities it would be irresponsible to allow the pipeline to start operating.
One of the landowners cited in the study is David Whitley, a self-described go-along guy who owns an 80-acre plot of land in Texas which the pipeline crosses.
(more)
InfoView thread info, including edit history
TrashPut this thread in your Trash Can (My DU » Trash Can)
BookmarkAdd this thread to your Bookmarks (My DU » Bookmarks)
2 replies, 1007 views
ShareGet links to this post and/or share on social media
AlertAlert this post for a rule violation
PowersThere are no powers you can use on this post
EditCannot edit other people's posts
ReplyReply to this post
EditCannot edit other people's posts
Rec (6)
ReplyReply to this post
2 replies
= new reply since forum marked as read
Highlight:
NoneDon't highlight anything
5 newestHighlight 5 most recent replies
TransCanada Has Already Had To Fix 125 Dents And Sags In Southern Keystone Pipeline (Original Post)
Bill USA
Nov 2013
OP
davidpdx
(22,000 posts)1. Is the pipe above or below ground?
Bill USA
(6,436 posts)2. "a staggering amount of excavations to correct dents and patch holes"... this sounds like at least
part of it is below ground. Probably all of it is below ground. If you are not in the permafrost area, I suppose it would be more protected from varying weather conditions, and possibly there is concerns about vandalism (?).. for which underground would be much better.
they had to keep the pipeline out of Alaska above ground to keep the warmed up crude from melting the permafrost (...faster than GW is doing it).