Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

mahatmakanejeeves

(57,712 posts)
Thu Mar 28, 2019, 12:24 PM Mar 2019

Positive train control fully activated on Amtrak Cascades corridor, WSDOT says

Hat tip, Trainorders:

Passenger Trains > "Positive train control fully activated on Amtrak Cascades corri"

Positive train control fully activated on Amtrak Cascades corridor, WSDOT says
By: KIRO 7 News Staff

Updated: Mar 25, 2019 - 1:10 PM

The Washington State Department of Transportation announced Monday that positive train control (PTC) is fully active for the Amtrak Cascades corridor, which incorporates the Point Defiance Bypass.

The Point Defiance Bypass is the section of track where an Amtrak train derailed heading into a sharp curve on an overpass in Dupont. Train 501 was on its maiden run on December 18, 2017, leaving Tacoma.

PTC is the train speed-control technology that possibly could have prevented the derailment from happening along the Point Defiance Bypass. PTC automatically slows or stops trains that are making improper movements, speeding, or not where they are supposed to be, WSDOT said.

The Amtrak train was recorded going 78 mph, more than double the posted speed of 30 mph, when 12 cars and two engines jumped the tracks.
Latest Discussions»Region Forums»Washington»Positive train control fu...