http://www.wlky.com/news/29651458/detail.htmlWLKY Investigates: Cracks In The Water System
-snip video-
After a crack closed the Sherman Minton Bridge, WLKY investigative reporter Duane Pohlman began an investigation into all Louisville's infrastructure.
-snip-
In the end, WLKY uncovered a troubling picture of needed repairs, replacements and rebuilding with a price tag estimated in the billions of dollars.
Part 1: Louisville’s Drinking Water: Cracking Water Mains
-long snip-
After spending $150 million to replace service lines, many of them made out of lead, Louisville Water Company is setting aside $100 million more to deal with the aging water mains.
-snip-
The Sewer Walk
-snip-
Under the heart of Louisville there is a 12-foot-high tunnel called the Broadway Sewer.
Construction on the massive sewer began when Ulysses S. Grant occupied the White House.
-long snip-
--------------------
good on Duane for doing this research